image description

G3 Inland Grain Terminal - Maidstone SK

G3 Inland Grain Terminal - Maidstone SK
Date: 2018

Description:
Design and construction of deep pile foundations for the new G3 Inland Grain Terminal in Maidstone Saskatchewan. The lump sum contract was a design/build contract for AGRA. The CFA pile design system was evaluated and considered the most cost effective solution for the geotechnical characteristics of the site.