Edmonton Valley Line LRT

Edmonton Valley Line LRT
Date: 2018

AGRA was retained by TransEd Partnership for the installation of the piles for the Elevated Guideways and Whitemud LRT Bridge on the Valley Line LRT Project in Edmonton. AGRA's scope of work included the performance of preliminary O'Cell static Load Tests, Supply and Installation of 1800 mm and 2500 mm piles with lengths up to 50.00m and Statnamic Proof Tests on representative piles. It also included very stringent Quality Control requirement like Geotechnical Pile Monitoring, Material Testing, Cross Hole Sonic Logging, PIT testing among others. The work area extended over 12.0 km with piles being installed in close vicinity to CN/CP rail tracks at 2 locations and major traffic arteries at 3 locations.